Skip to content

Our services

From no-dig pipe repair and high-pressure jetting to lake cleaning, commercial diving and CCTV inspection — delivered in place, with our own equipment and crews.

01 · Trenchless pipe rehabilitation

CIPP patch repair — a permanent repair from inside the pipe

A resin-impregnated fibreglass liner is wrapped around an inflatable packer, positioned at the defect and cured in place under pressure — sealing cracks, holes, joint gaps and active leaks without disturbing the road, paving or ground above.

< 2 hrs

Per patch repair

DN150–1000+

Pipe diameters

5–15 yrs

Written warranty

Wet liner wrapped onto the inflatable packer, ready for the manhole
CCTV view of a damaged, debris-filled pipe before repair
Final CCTV view of a cured, watertight patch

Our CIPP patch repair process

From inspection to permanent repair — in hours, not weeks.

  1. 1

    CCTV inspection & design

    CCTV survey identifies the defect, length and pipe condition. Our engineers select the right packer, liner and chemistry.

  2. 2

    Cleaning & surface prep

    The pipe is hydro-jetted clean and the repair zone prepared so the patch bonds strongly to the host pipe wall.

  3. 3

    Liner saturation (wet-out)

    A fibreglass liner is cut to size and fully saturated with resin formulated for Gulf temperature and groundwater.

  4. 4

    Packer wrapping

    The wet liner is wrapped around our purpose-built inflatable packer and pulled into position at the exact defect.

  5. 5

    Inflation & curing

    The packer is inflated against the pipe wall. The resin cures in 30 minutes to 2 hours, depending on the chemistry selected.

  6. 6

    Final CCTV verification

    The packer is removed and a final CCTV inspection confirms a smooth, structural and watertight patch.

Chemistry engineered for Gulf conditions

Off-the-shelf resins struggle in Gulf heat. Our three in-house resin systems let the crew match chemistry to how far the packer must travel from the manhole to the defect.

  • Quick-cure

    Defect close to the chamber

    30–40 min
  • Standard

    Defect a short distance into the run

    1–1.5 hr
  • Long-cure

    Defect mid-way between two manholes

    1.5–2 hr

Cured strength — tested

Manufacturer test results on 15 cured samples (GB/T 1449-2005 and GB/T 1440.4-2006) exceed the required structural minimums.

Bending (flexural) strengthRequired min. > 45 MPa
142 MPa
Flexural modulusRequired min. > 6,500 MPa
9,215 MPa
Compressive strengthRequired min. > 62 MPa
164 MPa

Figures as certified by the resin manufacturer; original certificates available for tender submissions.

Applications of chemical patching

Pipe joint gap seal

Permanently seals open joints where sections have shifted apart.

Pipe crack repair

Structural rebuild of longitudinal, circumferential and spider-web cracks.

Pipeline settlement

Restores integrity where bedding has dropped and the pipe deformed.

Hole & penetration repair

Closes third-party damage, corrosion holes and missing sections.

Active leakage stop

Stops live infiltration and exfiltration — bonded under pressure.

Sewage, storm & irrigation

Sewage networks, storm drainage, irrigation mains and process water.

We repair all pipe materials:

PVCUPVCGRPGREHDPEAsbestos cementCast ironDIGISteelCopperABS

Purpose-built packer systems

  • Sized for pipe diameters from DN150 to DN1000+
  • Uniform inflation pressure across the full patch — preventing wrinkles and bond failure
  • Safe-release geometry so the packer never gets stuck in the cured liner
  • Designed around the repair type, pipe condition and access
  • Built and tested in-house — no waiting on overseas parts
  • Multiple packers on standby for emergencies and parallel sites
UV LED lateral lining equipment set up over a manhole on site

UV LED lateral lining

BlueLight+ UV LED curing

Fast-curing UV LED technology for lateral and small-diameter sewer rehabilitation. An LED curing head with integrated camera travels through the inverted liner, curing it as it goes.

Curing speed
Up to 1.3 m/min
Pipe range
DN100–DN300
  • Compatible with various liner types
  • Reduced on-site footprint for streamlined operations
  • Suitable for horizontal and vertical pipelines
  • Short and long LED heads with integrated CCD camera and illumination
Ask about BlueLight+
Trailer-mounted high-pressure jetting unit in the Hydrojet workshop

02 · Pipe jetting & pipeline cleaning

Engineered for the toughest pipelines — 60 mm to 3000 mm

We design, build and supply our own jetting machines and tooling, and run them ourselves on site — high-pressure water jetting, CCTV inspection and environmental cleaning across the GCC.

19+

Years field experience

2,500+

Projects completed

200 bar

High-flow pressure

400 L/min

High-flow rate

A complete cleaning solution

Soft & hard concrete removal

Hydro-demolition and descaling without harming the host pipe.

Root & grout removal

Mechanical cutters and chain knockers clear roots, grout and intrusions.

Mud, sludge & sand removal

Sand-pulling nozzles and high-flow flushing evacuate heavy silt.

Seawater line cleaning

Specialised tooling for barnacles, shells and marine scale.

Low-flow & high-flow units

The right machine matched to pipe size, access and flow demand.

Full tooling library

Cutter, diamond, sand-pulling and rotary nozzles held in stock.

Our jetting equipment & tooling

Ready stock for deployment and supply — one source covering every pipe diameter and every type of blockage.

Diesel twin-axle high-flow jetting trailer

High-flow trailer units

Diesel twin-axle rigs, 200 bar / 400 L/min, for 300–3000 mm mains and continuous municipal duty.

Combination jetting and vacuum truck

Combination & vacuum trucks

Jetting plus vacuum recovery on one chassis, with large water and debris tanks and a telescopic boom.

Skid-mounted diesel triplex pump power pack

Recon & skid power packs

Diesel or electric drive with triplex pump on a forkliftable frame — truck, trailer or fixed mounted.

Hydrojet-branded stainless trolley jetters

Hydrojet-branded & portable units

Stainless trolley jetters with dual reels, plus petrol and electric units for 60–200 mm laterals.

Chain knocker descaling head

Chain knockers & descalers

Concrete, scale and barnacle removal heads.

Diamond cutter heads

Diamond cutter heads

For roots, grout and hard obstructions — each paired to the right pump.

Robotic cutting and milling assemblies

Packers & cutting assemblies

Robotic milling, lateral re-opening and patch-repair packers.

Custom tooling

Tell us the pipe, the access and the obstruction — we will build or match the head for it.

Proven in the field — UAE & GCC

  • Night-shift drain-line jetting on live highway networks
  • Truck, trailer and portable units mobilised to suit access and pipe size
  • Trained crews, ISO-aligned HSE and full traffic management
  • Equipment delivered and commissioned across Dubai and the wider GCC

03 · Marine & underwater jetting

Seawater lines cleared by water pressure — even at 100% blockage

Seawater intake and discharge lines choke with barnacles, shells and crystalline scale until flow is lost altogether. We clear them with high-pressure water — no mechanical cutter needed, though we have the tooling where one is warranted.

  • Barnacle & shell removal — hard fouling stripped without damaging the host pipe
  • Crystalline scale & calcite — mineral growth broken down and flushed clear
  • Intake & outfall lines — power plant, desalination, cooling and process seawater lines restored to full bore
  • Flow recovery verified — before-and-after CCTV and flow checks issued with the completion record
Diver operating hydro-jetting equipment underwater

Diver-operated hydro-jetting

Where the line, structure or tank cannot be lifted or drained, our commercial dive teams take the jetting equipment into the water and do the work in place.

Subsea & submerged pipelines

Internal and external jetting of submerged lines, risers, intakes and outfalls.

Structures & marine growth

Jacket legs, piles, jetties, gratings and screens cleaned to bare surface.

Hulls, sea chests & suctions

Sea chest, strainer and suction cleaning with the vessel afloat and in service.

Tanks & basins in service

Underwater tank cleaning with no draining and no confined-space entry.

Seabed & trench jetting

Jetting for excavation, cable and pipeline lowering and debris clearance.

Recorded & reported

Diver video, stills and a written record issued for class and client approval.

04 · Underwater cleaning & waste treatment

Lakes, creeks and tanks cleaned in place

Sludge lifted underwater, separated on site and filtered water returned to source. No draining. No tankering. No shutdown. A chemical-free mechanical treatment.

95%

Waste removed

30 m³/h

Throughput

100 m

Pump hose reach

4

Live demo sites

The method in six steps

Divers working the lake bed
Dewatered sludge cake from the screw press
Filtered water being returned to source
  1. 1

    Site setup

    Mobile unit positioned at the water's edge, safety barriers up, suction and discharge lines deployed.

  2. 2

    Extract sludge

    Diving team on SCBA vacuums sludge from the bed using a hydraulic submersible pump.

  3. 3

    Power & reach

    The hydraulic power pack stays on the bank — the hose extends up to 100 m to the pump.

  4. 4

    Divider tank

    Sludge discharges into a multi-chamber tank, where solids settle and the water clears.

  5. 5

    Treatment plant

    The plant draws clarified water and separates it through twin screw presses.

  6. 6

    Return to source

    Filtered clean water discharged back to the lake; solids collected for approved disposal.

Truck-mounted mobile treatment plant

Mobile Treatment Plant

Truck-mounted suction and purification unit — quad-screw type, semi-automated, our own brand.

Mobile treatment plant specification
Waste removalUp to 95% of the waste load
Throughput8–30 m³/h clear discharge; 60–80 m³/h pre-filtered
Sludge cake output600–2,000 kg per hour
Vacuum pump11 kW water-ring — 6.68 m³/min suction
DewateringTwo multi-disc screw presses, full stainless
Underwater extractionHydraulic submersible pump, 100 m hose reach
Pipeline unblockingOn-board high-pressure pump and clean water tank
ControlPLC automated, 304 stainless control cabinet
Power50 kW on-board generator or mains supply
Containerised mobile sewage treatment plant

Mobile Sewage Treatment Plant

Treats sewage on site — supports water reuse, cuts tanker costs, prevents contamination and removes the need to haul raw sewage to municipal plants.

Mobile sewage treatment plant specification
Purification rate30 m³/h · 70% water purification
Dry sludge157 kg in 1 hour
ControlPLC-based, fully automated operation
Vacuum pump3-phase 11 kW — 6.68 m³/min suction
Tanks1,000 L freshwater · 1,000 L sewage holding
DewateringScrew press dehydrators — dry solid output
PowerDiesel generator or external mains supply
CapacityScalable — upgrade or combine units for higher load

Applications

Construction campsLabour accommodationIndustrial sitesMilitary basesMining & oilfieldDisaster relief zonesRemote communitiesTemporary events

Proven live — Dubai Municipality demonstrations

The plant was run live in front of Dubai Municipality engineers across four sites. Separation was confirmed on every site.

Dubai Municipality demonstration results
LocationAssetSludgeRun timeRecorded result
Al Qusais AbattoirSewage tank20%60 min157 kg of dry sludge produced
Ras Al Khor IndustrialSewage pumping station V65%30 minSludge discharged, water clarified
Villa NovaIrrigation tank10%30 minDry sludge and clear water discharge
Dubai SouthPSF — pumping station5%Demo runDry sludge and clear water discharge

05 · Diving & underwater services

Commercial diving, inspection & marine works

Certified underwater solutions for the maritime, offshore and port industries — delivered with our group company Blue Seagull Diving Services L.L.C, operating to IMCA and ADCI commercial diving practice.

Diver working on a ship propeller

Shipping & marine

  • Hull, sea chest, thruster, rudder & propeller cleaning and IRM
  • Propeller polishing, evaluation & repair
  • Blanking, cofferdams, hole patching & epoxy sealing
  • Shaft, stern tube & rudder clearance readings
  • Entanglement removal, anchor search & recovery
  • Cathodic protection and anode installation
  • Vessel launching, beaching & dry-docking support
Diver performing underwater inspection and welding

Inspection, survey & NDT

  • UWILD & class surveys with classification societies
  • Comprehensive visual inspection (GVI/CVI)
  • MPI & ACFM weld testing, eddy current testing
  • Wall thickness gauging & flooded member inspection
  • Cathodic potential measurement & scour assessment
  • On/off-hire, damage, pipeline & cable route surveys
  • Photography, videography & CCTV reporting
Offshore oil and gas platform

Offshore oil & gas / ROV

  • Surface-supplied air & mixed-gas diving to 300 fsw
  • Installation & IRM of platforms, jackets, BOPs & wellheads
  • Risers, I-tubes, J-tubes, riser clamps & protectors
  • Pipeline tie-ins, metrology & HydraTight operations
  • Concrete mattresses, subsea sleepers & crossings
  • Derrick / lay barge support and salvage
  • Platform removal and P&A support
Single point mooring buoy at sea

SBM / SPM operations

  • Installation & maintenance of SBM/SPM units and PLEMs
  • Buoy, chain, subsea hose & anchor inspections
  • NDT & class-certified third-party inspection
  • Hose string makeup & hydrostatic pressure testing
  • Mooring / de-mooring assistance
  • Above-water buoy, navigation aid & telemetry checks
Diver working along a subsea pipeline

Pipeline & power plant

  • Intake screens, chlorination & aeration lines
  • Intake pits, seawater & fire pump suctions
  • Trenching, laying & burial of subsea pipelines
  • GRP, HDPE, concrete-coated steel & flexible lines
  • Pipeline Emergency Repair (ERP)
  • Seawater oil booms & fibre optic cable laying support
Crew working at a vessel mooring

Inland, nearshore & specialised

  • Jetty, sheet pile & travelling water screen repair
  • Marine construction, block placing & foundations
  • Hydraulic dredging & sediment removal
  • Salvage & 24/7 emergency dive response
  • Geotextile erosion protection & floating pontoons
  • Swimming pool cleaning, leak detection & repair

06 · Storm & drainage networks

CCTV pipeline inspection

Crawler-mounted CCTV survey of live storm network pipelines — recorded upstream to downstream with continuous chainage and depth logging, and issued as a condition report with defect locations.

  1. 1

    Full internal survey

    Crawler camera run through the barrel, recording wall condition, joints, infiltration and silt levels.

  2. 2

    Chainage & depth logged

    Every observation referenced to distance and depth so defects can be located from the surface.

  3. 3

    Man-entry inspection

    Where the diameter allows, confined-space trained crews enter to verify and measure defects directly.

  4. 4

    Condition report

    Video, stills and a written report issued for the client and the authority.

CCTV crawler in a storm water barrel

Excavation & pipeline repair

Where the survey finds a defect, we open up, repair and reinstate — working around live services, lakeside properties and public access, day or night to suit the site.

  • Controlled-access excavation
  • Concrete break-out & removal
  • Pipe exposure & repair
  • Flow restored & verified
  • Night works where needed
  • Site footage for the record

Not sure which service you need?

Describe the asset and the problem — our engineers will recommend the right method, crew and equipment.